Oregon · NRMCA 2026 · Updated September 2026

Concrete Prices in Oregon — 2026 Cost Guide + Calculator

Ready-mix concrete in Oregon costs $128–$162 per cubic yard in 2026. Portland metro averages $148–$162/yd³; Eastern Oregon runs $128–$142/yd³. Oregon has no state sales tax — a meaningful savings on large concrete projects. The rainy season (Oct–May) limits your pour window and raises contractor availability in summer.

NRMCA 2026 · BLS OEWS Oregon Cement Masons · Oregon DOR — No sales tax
$142
Avg material/yd³ — NRMCA 2026 Oregon
$7–$13
Installed per sq ft (material + labor)
0%
Oregon state sales tax — saves $800+ on large pours
Jun–Sep
Best pour window in Western Oregon
  Oregon Concrete Costs & Prices

How much is 1 yard of concrete in Oregon right now?

A cubic yard of ready-mix concrete in Oregon costs $128–$162/yd³ at the batch plant in 2026. Portland metro (Multnomah, Washington, Clackamas counties) averages $148–$162/yd³ — elevated by strong residential demand and union labor rates. The Willamette Valley (Salem, Corvallis, Eugene) runs $138–$150/yd³. Southern Oregon (Medford, Ashland) averages $132–$145/yd³. Eastern Oregon (Bend, Pendleton, Baker City) is the most affordable at $128–$142/yd³, though delivery surcharges apply in remote areas. These are material prices only; installed cost adds $4–$7/sq ft statewide.

Free Tool

Oregon Concrete Calculator

Select your Oregon region to pre-load local pricing. Enter dimensions and get cubic yards, material cost, and installed estimate with 10% overage built in.

Oregon Concrete Cost Calculator — 2026 Live Pricing
ft
ft
in

Oregon note: Western Oregon's rainy season (Oct–May) limits safe pour windows. Schedule for June–September in the Portland metro and Willamette Valley for best contractor availability. Eastern Oregon and Bend are drier — year-round pouring with freeze precautions in winter.

Find Costs & Prices in Your City — Oregon

Oregon Concrete Costs & Prices by City — 2026

Standard 3,000–3,500 PSI mix, plant-gate price. Delivery within 10 miles adds $10–$16/yd³ in Portland metro, $8–$14/yd³ elsewhere. No Oregon sales tax on any of these figures.

City / Area PSI $/yd³ (material) $/sq ft installed Notes
Portland / Multnomah Co.3,000$150–$162$8–$13Highest demand in OR; union labor standard
Beaverton / Hillsboro (Washington Co.)3,000$148–$158$7–$12Portland suburb; tech corridor demand
Lake Oswego / Clackamas Co.3,000$146–$156$7–$12Affluent south Portland suburbs
Salem / Marion County3,000$140–$152$7–$11State capital; stable mid-market
Corvallis / Albany3,000$138–$150$6–$11Mid-Willamette; university markets
Eugene / Springfield (Lane Co.)3,000$136–$148$6–$11South Willamette; competitive pricing
Medford / Jackson County3,000$132–$145$6–$11Southern Oregon hub; hot dry summers
Bend / Deschutes County3,500$132–$144$6–$11High-growth market; freeze-thaw in winter
Oregon Coast (Newport / Coos Bay)3,000$134–$146$6–$11Saltwater proximity — coastal spec recommended
Pendleton / Eastern Oregon3,500$128–$140$6–$10Freeze-thaw exposure; most affordable region
Remote Eastern Oregon3,500$135–$148$7–$11Delivery adds $15–$30/yd³ from nearest plant

Common Concrete Jobs in Oregon

What Concrete Contractors Charge in Oregon — 2026

Installed estimates (material + labor + forming + broom finish). Portland uses $155/yd³ + $6/sq ft labor. Eastern OR / Southern OR uses $135/yd³ + $4.50/sq ft labor.

Project Size / Thickness Yards needed Material cost Installed (Eastern/Southern OR) Installed (Portland Metro)
Small patio10×10 / 4"1.2 yd³$155–$205$580–$880$800–$1,250
20×20 concrete slab20×20 / 4"5.9 yd³$765–$990$2,800–$4,300$4,000–$6,400
Concrete driveway16×38 / 5"9.4 yd³$1,215–$1,570$4,500–$6,900$6,300–$9,700
40×60 concrete slab40×60 / 6"44.4 yd³$5,755–$7,435$20,000–$30,000$28,000–$43,000
Garage floor (24×24)24×24 / 6"12.9 yd³$1,670–$2,160$5,800–$8,900$8,100–$12,500
Stamped concrete patio16×20 / 4"3.9 yd³$505–$655$3,800–$5,800$5,400–$8,500
Foundation footing24 lin ft / 12"×12"2.1 yd³$270–$350$1,100–$1,800$1,500–$2,500

How Concrete Pricing Actually Works in Oregon

Oregon Concrete Costs — What Drives the Price

Oregon Has No Sales Tax — What That Means for Concrete Projects

Oregon is one of five US states with no state sales tax, and it's the only major Pacific state without one. Washington charges 6.5%, California 7.25%+. For a $15,000 concrete driveway, that's a saving of $975–$1,088 compared to ordering the same project across the border in Washington state.

This also means the price your contractor quotes is the price you pay — no tax added to labor or materials on your invoice. Oregon contractors don't need to charge sales tax on home improvement work, which simplifies the quote comparison process and removes a common source of quote-to-invoice surprise in neighboring states.

StateSales taxTax on a $15,000 projectvs Oregon
Oregon0%$0—
Washington6.5%$975Oregon saves $975
California7.25%+$1,088+Oregon saves $1,088+
Idaho6.0%$900Oregon saves $900

Source: Oregon Department of Revenue. Oregon has no general sales tax by state constitution.

Oregon's Rainy Season — Why Timing Your Pour Matters

Western Oregon (Portland, Willamette Valley, Oregon Coast) receives 38–60+ inches of annual rainfall, almost all of it between October and May. Pouring concrete in the rain isn't just inconvenient — rain dilutes the mix water ratio and can compromise the surface finish and long-term strength of the slab.

The practical pour window in Western Oregon is roughly June through September. This 4-month window means Portland and Willamette Valley contractors are booked 4–8 weeks out by late May. Book early or plan for the following season.

RegionAnnual rainfallBest pour windowPeak season premium
Portland / Willamette Valley38–50"June–September+5–10% June–August
Oregon Coast55–100"July–August (narrow)+10–15% in season
Southern Oregon (Medford)18–22"April–NovemberMinimal premium
Bend / Central Oregon11–13"April–October (freeze precautions Nov–Mar)Minimal premium
Eastern Oregon10–15"May–OctoberMinimal premium

Is $7/sq ft Too High for a Concrete Driveway in Oregon?

No — and in Portland, it's actually on the low end. Here's how to put the number in context for Oregon in 2026:

Installed pricePortland MetroWillamette ValleyEastern/Southern OR
Under $6/sq ftBelow market — check PSI spec and contractor credentialsPossible with minimal prepReasonable for basic projects
$7–$9/sq ftFair market — standard 3,000 PSI, broom finishStrong valueGood to excellent
$9–$12/sq ftGood — includes subgrade prep or thicker pourAbove average — verify what's includedAbove market — ask for itemization
Over $12/sq ftStamped / decorative or complex access onlyLikely decorative or slope workInvestigate — probably over-quoted

For a standard 16×38 ft residential driveway in Portland (roughly 608 sq ft), a fair installed quote runs $4,200–$5,500 at $7–$9/sq ft. If a quote comes in at $3,500 ($5.75/sq ft), ask specifically: what PSI, what thickness, is subgrade included, and does the contractor carry Oregon CCB registration?

Oregon Contractor Licensing — CCB Registration Required

In Oregon, any contractor performing concrete work for compensation must be licensed with the Oregon Construction Contractors Board (CCB). This is a legal requirement — not optional — for all residential and commercial concrete work.

  • Verify CCB license: Search the contractor's name or CCB number at oregon.gov/ccb before signing. Active license, no disciplinary history.
  • Written contract required: Oregon law requires a written contract for any home improvement over $2,000. The CCB license number must appear on the contract.
  • Dispute resolution: Working with a CCB-licensed contractor gives you access to Oregon's contractor dispute resolution process — not available with unlicensed workers.
  • Do I need a permit? Most Oregon municipalities require a building permit for poured concrete driveways and patios over a certain size threshold. Check with your city or county building department before any pour — Portland, Beaverton, Salem, and Eugene all have active permit requirements for residential concrete work.

Additional Concrete Services — Oregon Cost Reference

ServiceEastern/Southern ORPortland MetroNotes
Stamped concrete (Portland area)$12–$18/sq ft$16–$26/sq ftPortland decorative market is competitive; get 3 bids
Epoxy floor coating$4–$7/sq ft$5–$10/sq ftHumidity in Western OR — moisture barrier critical
Concrete slab leveling (mudjacking)$400–$1,800$600–$2,500Portland clay soils cause settlement; common service
Polyjacking (foam leveling)$600–$2,500$800–$3,500Growing in Portland; faster than mudjacking
Concrete sawing / cutting$2.50–$6/lin ft$3–$8/lin ftControl joints, utility access
Concrete demolition & removal$1.50–$4/sq ft$2.50–$6/sq ftPortland disposal fees higher than rural OR

Frequently Asked Questions: Concrete in Oregon

Oregon Concrete — FAQ

A cubic yard of ready-mix concrete in Oregon costs $128–$162 at the batch plant in 2026. Portland metro averages $150–$162/yd³. Eastern Oregon is the most affordable at $128–$140/yd³. Oregon has no state sales tax, so the price quoted is the price you pay. Add $10–$16/yd³ for delivery in the Portland metro, $8–$14/yd³ elsewhere.

A 20×20 ft slab at 4" thickness needs about 5.9 cubic yards (6.5 with overage). Installed cost: $2,800–$4,300 in Eastern and Southern Oregon and $4,000–$6,400 in Portland metro (material + labor + forming + broom finish). At 6" for a garage floor, add approximately 50% to material cost and 20–25% to total installed.

A 40×60 ft slab at 6" depth requires approximately 44.4 cubic yards. Installed: $20,000–$30,000 in Eastern/Southern Oregon and $28,000–$43,000 in Portland metro. Material alone: $5,755–$7,435 depending on region. At this scale, get 3–4 contractor bids. In Portland, peak-season bookings (June–August) are tight — plan 6–10 weeks ahead.

Stamped concrete in Portland costs $16–$26 per square foot installed in 2026 — one of the higher ranges in the Pacific Northwest due to Portland's elevated labor rates and strong decorative concrete market. Simple single-color patterns (ashlar, cobblestone) sit at $16–$20/sq ft; complex multi-tone borders or custom designs run $22–$26/sq ft. Portland has a strong decorative concrete contractor base — get 3 bids and verify CCB license on each. Outside Portland, Medford and Eugene run $12–$18/sq ft for equivalent work.

"Poor man's concrete" is crusher run (crushed stone and fines) compacted into a firm surface — used in rural Oregon for driveways, parking areas, and equipment pads where cost is the priority. In Oregon, crusher run costs $18–$38/ton delivered. A standard 16×40 ft rural driveway needs roughly 12–15 tons ($215–$570 total) vs. $1,200–$1,600 for a concrete pour of the same area. The trade-off: crusher run generates mud in Western Oregon's wet winters, needs re-grading every 2–4 years, and degrades over time. In the wet climate of the Willamette Valley, it's a poor long-term choice compared to concrete.

A 10×10 ft slab at 4" requires about 1.2 cubic yards (1.3 with overage) — approximately 55 bags of 80 lb. At $9–$13/bag in Oregon, that's $495–$715 in bags plus significant mixing labor. A ready-mix delivery of 1.3 yards in Oregon costs $165–$215 for material (plus short-load surcharge). For any pour over 1 cubic yard, ready-mix is more economical and consistent. One 80 lb bag yields approximately 0.60 cubic feet; divide your total cubic feet by 0.60 to get bag count.

A 20×20 ft slab at 4" thickness requires 5.9 cubic yards raw, or 6.5 yards with 10% overage — always order the overage amount. At 6" thickness, you need 8.9 yards raw (9.8 with overage). Use the calculator above to get an instant Oregon-specific estimate by region. One yard of concrete covers 81 sq ft at 4" thickness, 54 sq ft at 6".

Standard concrete thickness recommendations for Oregon: 4" for patios and walkways in Western Oregon; 4"–5" for residential driveways in Portland and the Willamette Valley; 5"–6" for driveways in Eastern Oregon and Bend where freeze-thaw cycles are more severe. Garage floors: 4" minimum, 6" if you plan to store heavy vehicles or equipment. Foundation footings: typically 12"+ deep depending on frost depth — 24"–36" in most of Oregon, deeper in the mountains. Always verify local code with your building department.

New concrete typically reaches sufficient strength for foot traffic in 24–48 hours after placement. For passenger vehicle traffic, wait 7 days minimum — concrete reaches approximately 70% of its 28-day strength by day 7. For heavy trucks or equipment, wait the full 28 days. In Oregon's cool, wet spring and fall weather, curing may take longer — if temperatures drop below 50°F within the first 48 hours, use curing blankets and extend wait times by 1–3 days. In summer heat (common in Southern Oregon and Bend), keep the slab moist for 7 days to prevent premature drying and surface cracking.

Reviewed by the ConcreteCalc Editorial Team
Construction & Materials Research

Oregon pricing verified against NRMCA 2026 national data, BLS OEWS cement mason wage series for Oregon and Portland MSA, Oregon DOR no-sales-tax policy, and Oregon CCB licensing requirements. Portland metro, Willamette Valley, Southern Oregon, and Eastern Oregon data cross-referenced with regional batch plant surveys. Updated September 2026. Reviewed quarterly.

Go up